1.
Remove the tube lock check valves from the enclosed bag and install as shown in the drawing.
2. Mount each of the foam sticks to a suitable surface. They should be
mounted so that the last hole (in the cap) hits the bottom of the
vehicle. The stick sets should be "mirror-images" of each other once
mounted.
3. Run 1/2" I.D. chemical tubing from the "solution pumping source"
to the middle of the arch and connect with a tubing tee (not included).
From there step down to 3/8" I.D. tubing and connect to the solution
check valve. The tubes must be the same length for the best performance.
4. Run 1/4" air tubing from your compressed air supply and push
connect it to the 1/4" tube lock of the supplied tee. Run the supplied
5/32" tubing to each stick.