Ready to Use Chemical Solution | |
Solution Pressure | 40 - 60 PSI |
Flow Rate | up to 1.55 GPM |
Compressed Air | up to 1.5 CFM |
Liquid tubing - pump to tee | 1/2" I.D. |
Liquid tubing - tee to foam sticks | 3/8" I.D. |
Tubing from air supply | 1/4" I.D. |
Requirements
Ready to Use Chemical Solution | |
Solution Pressure | 40 - 60 PSI |
Flow Rate | up to 1.55 GPM |
Compressed Air | up to 1.5 CFM |
Liquid tubing - pump to tee | 1/2" I.D. |
Liquid tubing - tee to foam sticks | 3/8" I.D. |
Tubing from air supply | 1/4" I.D. |
Overview
Safety & Operational Precautions
To Install (refer to diagram on next page)
To Operate
Troubleshooting Guide |
---|
Problem | Possible Cause / Solution | |
---|---|---|
Startup | Maintenance | |
A) Foam surges or sputters. B) Foam too dry. C) Foam too wet. D) Solution drips after shutting down. | 1, 2, 3, 4, 5 1 1, 3, 4, 5 |
6, 7, 8 6 6 |
Possible Cause / Solution | |
---|---|
Startup | Maintenance |
|
|
PREVENTIVE MAINTENANCE: When the unit will be out of service for extended periods, place chemical tube(s) in water and flush the chemical out of the unit to help prevent chemical from drying out and causing build-up. Periodically check and clean chemical strainer and replace if missing. |